5. Work begins on January 1, 20. 4. That the CONTRACTOR must pay a fine equal to 1% of the contract price for each day of turnover delay. 7. That the owner agree to pay 30% of the contract price at least 5 working days before the scheduled start date in the form of a down payment and the 70% balance payable in identical weekly payments based on the signing date until the expected end of the project. If necessary, additional costs must be borne as needed. 1. That the CONTRACTOR agree to renovate and renovate ABC COFFEE SHOP at the price of the pesos contract: 000,000.00 (amount in words). (2) The contractor`s obtaining of the necessary building permits is responsible for the purchase of equipment, the recruitment of personnel, the coordination with the architect and the owners with respect to the details of the construction and the approval of the materials. 3. that the CONTRACTOR completes and surrounds the coffee in question at the contract price and in accordance with plans and specifications, Thoroseal or approved equivalent Fabricate 3mm metallic decoration borders in antique finished shelves, Cabinet doors, laminates and other details on surfaces: according to color specifications, tiles, and finish interior walls as in the schedule of surfaces install the suspended system of ceiling beams as on the reflective plan pin lamps, special fixtures, recessed lighting, halogen steering lights and other electrical requirements, as stated in the plans.

CONSIDERING that the ENTITY wishes that contractor to exectue DESIGN AND BUILD OF RENOVATION AND UPGRADING OF NEURO-WARD (here called “works”) and the ENTITY has accepted the offer for twelve million nine hundred six hundred six hundred and thirty-two pesos and eighty-eight centavos (Php 12,906,632.87) by the CONTRACTOR for the execution and completion of such work. The Republic of the Philippines HEALTH HEALTH Center Davao Regionsouthern Philippines MEDICAL CENTERJ.P. Laurel Avenue. Davao City WHEREAS, all work in this project, as covered by this CONTRACT, will be completed within 180 (one hundred and eighty) calendar days, in accordance with the specifications. Install 12 x 12 Mariwasa ceramic tiles (Montalban Beige – Red). THE WE, (name of contractor), major, single/married, a resident of (the address), the following referred to as contractor and (owner`s name), adult, single/married, a resident of (the address) and the owner below, accept and declare: 9.